Services
Tiling, floors and decorating
Splashbacks and wall tiling, kitchen flooring, plastering and decorating to finish the room.
Splashbacks and tiling
Tiled, glass and stone splashbacks and wall tiling, fitted once the worktops and sockets are in
Kitchen flooring
LVT, vinyl, tiled and engineered wood kitchen floors laid on a level, dry base, before or after the units
Kitchen plastering and decorating
Walls and ceilings skimmed or re-boarded after strip-out, then decorated in wipeable kitchen paint
Guide prices for tiling, floors and decorating
National guide ranges including VAT at 20%. Local pages adjust these for your region, and every price is confirmed after a free survey visit.
| Service | Typical job | Guide price |
|---|---|---|
| Splashbacks and tiling | Tiled splashback | £150–£400 |
| Kitchen flooring | LVT or vinyl, kitchen floor | £500–£1,500 |
| Kitchen plastering and decorating | Skim kitchen walls and ceiling over sound plaster | £350–£800 |
Common questions
Can a glass splashback go behind a gas hob?
Yes, usually, as long as the glass is toughened and the hob maker's instructions allow it. Toughened glass handles heat far better than ordinary glass, but a gas hob must still keep the clearances set out in its installation instructions, so we check those before ordering. The panel is measured after the worktops are fitted and made with cut-outs for sockets, because it cannot be cut once toughened.
Should kitchen flooring go down before or after the units?
It depends on the floor. Tiles are often laid first, or at least run under the appliance spaces, so a dishwasher or fridge can be pulled out without catching on the edge. Floating floors such as click LVT or engineered boards usually go down after the units, up to the plinth line, so they are not trapped under heavy fixed cabinets. We follow the flooring maker's instructions.
Should a kitchen be plastered before or after the units are fitted?
Before. Plastering is done after strip-out and first-fix electrics and plumbing, so new cables and pipes are chased in and covered, and before the base and wall units go in. Units then fix to a flat, finished surface, and the decorator only needs to cut in around them at the end. Patch repairs after fitting are possible but harder to hide.
